Customer: Private Customer
Location: New CaledoniaDate:
Date: July 2013 - Jan 2014
This project constructed in New Caledonia is a steel frame structure. This type of construction utilises back to back C purlins bearer and C purlin joist.
On this job Eco Construction has used the Heavy Duty Mega Anchor MA1# & Heavy Duty Flat Top MA15#. They have also used a specialised bolt on T & Angle top that connects to the Heavy Duty Flat Top M15#.
This project has been used to test and certify the Mega Anchor for use in New Caledonia